Access the Online Archive
Search the Historical Archive of the Pirelli Foundation for sources and materials. Select the type of support you are interested in and write the keywords of your research.
    Select one of the following categories
  • Documents
  • Photographs
  • Drawings and posters
  • Audio-visuals
  • Publications and magazines
  • All
Help with your research
To request to view the materials in the Historical Archive and in the libraries of the Pirelli Foundation for study and research purposes and/or to find out how to request the use of materials for loans and exhibitions, please fill in the form below. You will receive an email confirming receipt of the request and you will be contacted.
Pirelli Foundation Educational Courses

Select the education level of the school
Back
Primary schools
Pirelli Foundation Educational Courses
Please fill in your details and the staff of Pirelli Foundation Educational will contact you to arrange the dates of the course.

I declare I have read  the privacy policy, and authorise the Pirelli Foundation to process my personal data in order to send communications, also by email, about initiatives/conferences organised by the Pirelli Foundation.

Back
Lower secondary school
Pirelli Foundation Educational Courses
Please fill in your details and the staff of Pirelli Foundation Educational will contact you to arrange the dates of the course.
Back
Upper secondary school
Pirelli Foundation Educational Courses
Please fill in your details and the staff of Pirelli Foundation Educational will contact you to arrange the dates of the course.
Back
University
Pirelli Foundation Educational Courses

Do you want to organize a training programme with your students? For information and reservations, write to universita@fondazionepirelli.org

Visit the Foundation
For information on the Foundation's activities and admission to the spaces,
please call +39 0264423971 or write to visite@fondazionepirelli.org

Life and Work in the Tower

In April 1960, the Pirelli Centre came to life. The first twelve floors were set aside for rental to other companies, the central ones were for the Group’s subsidiaries and the floors from the sixteenth up were to be for staff functions, with the Central Administration Department, the Research Office, the Purchasing Department, the Advertising Department, the Human Resources Department, and Accounting and Administration, as well as general management of the cables and rubber sectors.

Each floor had its own management office, and the workplaces, as we see in the “A Photographer in the office” report published in Fatti e notizie, in issue no. 4 of 1960, were arranged in bright open spaces with air conditioning. The tower could accommodate about 2000 people, who came in and out and moved around the building every day.

What made the design so advanced was thus not only the architectural and structural solutions, but also that of the services, making mobility and work within the building extremely efficient. Preliminary study had assessed movements in and out of the building (from Via Fabio Filzi or from the square in front of the central station) as well as inside, estimating the number of people, times of day, and the means by which people would reach the tower, taking into consideration both employees and external guests. One of the reasons for building a tower rather than a horizontal building was because it would be possible to move around inside using lifts.

After assessing the number of people on each floor and their needs, ten lifts with different capacities and speeds were designed to serve the various floors. Using a system of synchronised clocks, the lifts could automatically adapt to four different conditions of traffic: peak traffic up and down during the hours when the staff entered and left the building, normal traffic, and reduced traffic. Also the mail sorting system was carefully planned and designed. The average daily volume of mail consisted of 11,000 letters, 900 magazines, almost 2000 large packages and 300 telegrams. A system of post boxes was created up the entire length of the building, so that they could be sent from the post office to the right floor and unloaded using a sloping surface into a collection bin. These were new approaches to the work experience for the future “Italy on the move”.

Back to the main page

In April 1960, the Pirelli Centre came to life. The first twelve floors were set aside for rental to other companies, the central ones were for the Group’s subsidiaries and the floors from the sixteenth up were to be for staff functions, with the Central Administration Department, the Research Office, the Purchasing Department, the Advertising Department, the Human Resources Department, and Accounting and Administration, as well as general management of the cables and rubber sectors.

Each floor had its own management office, and the workplaces, as we see in the “A Photographer in the office” report published in Fatti e notizie, in issue no. 4 of 1960, were arranged in bright open spaces with air conditioning. The tower could accommodate about 2000 people, who came in and out and moved around the building every day.

What made the design so advanced was thus not only the architectural and structural solutions, but also that of the services, making mobility and work within the building extremely efficient. Preliminary study had assessed movements in and out of the building (from Via Fabio Filzi or from the square in front of the central station) as well as inside, estimating the number of people, times of day, and the means by which people would reach the tower, taking into consideration both employees and external guests. One of the reasons for building a tower rather than a horizontal building was because it would be possible to move around inside using lifts.

After assessing the number of people on each floor and their needs, ten lifts with different capacities and speeds were designed to serve the various floors. Using a system of synchronised clocks, the lifts could automatically adapt to four different conditions of traffic: peak traffic up and down during the hours when the staff entered and left the building, normal traffic, and reduced traffic. Also the mail sorting system was carefully planned and designed. The average daily volume of mail consisted of 11,000 letters, 900 magazines, almost 2000 large packages and 300 telegrams. A system of post boxes was created up the entire length of the building, so that they could be sent from the post office to the right floor and unloaded using a sloping surface into a collection bin. These were new approaches to the work experience for the future “Italy on the move”.

Back to the main page

Multimedia

Images